Shipping Days |
|
---|
?* Information on days to ship and prices
LAPP
› Configure now
|
|
Starting from∗ : | 247.20 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
LAPP
› Configure now
|
|
Starting from∗ : | 643.44 € |
---|---|
Min. Shipping Days : | 32 Days |
*Unit price with basic configuration
LAPP
› Configure now
|
|
Starting from∗ : | 25.25 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
› Configure now
|
|
Starting from∗ : | 167.64 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days |
Overall Length(m) |
Conductor Cross Section(mm2) |
AWG size(AWG) |
Finished outer diameter(mm) |
Sheath (outer coating) color |
Sheath (outer coating) material |
Insulation body materials |
Brand | LAPP | LAPP | LAPP | LAPP |
---|---|---|---|---|
Product Series | ||||
Starting from∗ | 247.20 € *Unit price with basic configuration Volume Discount | 643.44 € *Unit price with basic configuration Volume Discount | 25.25 € *Unit price with basic configuration Volume Discount | 167.64 € *Unit price with basic configuration Volume Discount |
Min. Shipping Days | 5 Days | 32 Days | 5 Days | 5 Days |
Overall Length(m) | 100 ~ 500 | 400 | - | 100 ~ 1000 |
Conductor Cross Section(mm2) | 6 | 6 | 0,14 | 0,34 |
AWG size(AWG) | - | 10 | - | - |
Finished outer diameter(mm) | 5,5 | 5,5 | 5,5 | 5,5 |
Sheath (outer coating) color | - | - | Black | Black |
Sheath (outer coating) material | - | - | Rubber-Based | Other |
Insulation body materials | - | - | - | - |
Loading...
Filter by:
Overall Length(m)
Conductor Cross Section(mm2)
AWG size(AWG)
Finished outer diameter(mm)
Sheath (outer coating) color
Sheath (outer coating) material
Insulation body materials
Brand
CAD data type